Current Status: Operation
Gazipur 300 MW Furnace Oil Power Plant, also known as Summit Gazipur Power Plant or Kodda 300 MW Power Plant, is a reciprocating engine-based power plant situated in Kodda Bazar under Gazipur Sadar Upazila in Gazipur District of Bangladesh (Location: 23.9905, 90.3373). It is sponsored by Summit Gazipur II Power Limited (SGIIPL), a Special Purpose Vehicle (SPV) of Summit Group, as a private Independent Power Producer (IPP) for 15 years. The sponsor declared its Commercial Operation Date (COD) on 10 May 2018 and, as per schedule, the power plant will retire on 9 May 2033.
Capacity
The installed and net capacity of the power plant is 307.368 and 300 MW respectively.