Kamalaghat 54 MW (Banco) HFO Power Plant

Updated: Mar 6, 2023

Current Status: Operation

Kamalaghat 54 MW Furnace Oil Power Plant, also known as Banco Munshiganj Power Plant, is a reciprocating engine-based power plant situated at Kamalaghat Bazar under Mirkadam Upazila in Munshiganj District of Bangladesh (Location: 23.5735, 90.4903). It is sponsored by Banco Energy Generation Limited (BEGL), a Special Purpose Vehicle (SPV) of Doreen Group, as a private Independent Power Producer (IPP) for 15 years. The sponsor declared its Commercial Operation Date (COD) on 1 January 2018 and, as per schedule, the power plant will retire on 31 December 2032.


Capacity

The installed and net capacity of Banco Kamalaghat Power Plant is 56.70 MW and 53.972 MW respectively.