Current Status: Canceled
Patuakhali 1320 MW Coal Power Plant (SKS), also known as SKS Patuakhali Coal Power Plant, is a canceled Ultra-supercritical (USC) thermal power plant was to be situated in Payra port under Kalapara Upazila in Patuakhali District of Bangladesh (Location: 22.0253, 90.3118). It was proposed by Sena Kalyan Sangstha (SKS), a business entity of Bangladesh Army, to install and operate as a private Independent Power Producer (IPP) for 25 years. As per schedule, the power plant was to start commercial operation in 2030. But no progress was seen by November, 2020 when the Government of Bangladesh (GOB) declared not to build anymore coal power plants in the country. SKS also removed the information on the power plant from their website.