Bheramara 410 MW (NWPGCL) DFG Power Plant
- Jun 19
- 4 min read
Updated: Jun 25
Current Status: Operation

Bheramara 410 MW Gas Power Plant, also known as Bheramara CC Power Station, is a Combined Cycle (CC) power plant situated in Bahir Char under Bheramara Upazila in Kushtia District of Bangladesh (Location: 24.0504, 89.0175). It is sponsored by North-West Power Generation Company Limited (NWPGCL), a State-owned Enterprise (SOE) under the Bangladesh Power Development Board (BPDB), as a Public Power Plant (PPP) for 22 years. The sponsor declared its Commercial Operation Date (COD) on 9 May 2017 (simple cycle) and 14 December 2017 (combined cycle). According to the schedule, It will retire on 8 May 2039 and 13 December 2039, respectively.
Capacity
The power plant's installed (gross) and derated (net) capacity is 414 MW and 410 MW, respectively ( BPDB,2026).The plant operates as a baseload CCGT facility with a transmission system of 230 kV and 132 kV, operating frequency of 50 Hz, and power factor of 0.8 lagging (IAR, 2025).
Context
The power plant's genesis can be traced back to the year 2000, when the country's electricity consumption was rapidly outpacing its generation capacity. With an annual demand growth rate of approximately 8%, Bangladesh faced the challenge of meeting a projected demand of 19,312 MW by 2025. This staggering figure necessitated the urgent construction of over 5,000 MW of capacity by 2015 and around 20,000 MW by 2025, factoring in a 25% reserve margin.
In 2007, the Japan International Cooperation Agency (JICA) stepped in, conducting a comprehensive feasibility study that laid the groundwork for the realisation of the Bheramara power plant. With construction commenced in July 2014, the first phase of the plant, boasting a capacity of 278 MW, was commissioned in 2017. The remaining 132 MW, completing the plant's full capacity of 410 MW, commitioned in 2018 (GEMW, 2023).
The plant is located in Bahir Char under Bheramara Upazila in Kushtia District of Bangladesh. The site is near Bheramara thermal power plant. It is situated near Bheramara Thermal Power Plant.
Land Acquisition
The power plant covers approximately 11.43 acres according to google earth.
Financiers
The Bheramara Combined Cycle Dual Fuel Power Plant, with a total construction cost of BDT 37.85 billion, was financed through a collaboration between the Government of Bangladesh (GOB) and the Japan International Cooperation Agency (JICA). The GOB contributed BDT 6.35 billion, reflecting the commitment of the government to invest in critical infrastructure projects (FE,2018). Simultaneously, JICA, the Japanese governmental agency specialising in development assistance, provided project assistance to support the construction and development of the power plant. (NWPGCL, 2023).
Sponsor
The Bheramara 410 MW Combined Cycle Power Plant, a vital addition to Bangladesh's power infrastructure, is sponsered by the North West Power Generation Company Limited (NWPGCL). (NWPGCL, 2023).
Contractors
The Bheramara Combined Cycle Dual Fuel Power Plant was executed by M/s. Marubeni Corporation, Japan, serving as the Engineering, Procurement, and Construction (EPC) contractor. The contract, formalised on March 16, 2014, marked Marubeni Corporation's commitment to manage the plant's design, material procurement, and construction. (NWPGCL, 2023). The EPC contractor was M/s Marubeni Corporation, Japan. The EPC subcontractor was Larsen & Toubro Limited (India), and owner's consultant was a joint venture of TEPSCO (Japan) and Fichtner (Germany) (IAR, 2025).
Fuel Supply
The Bheramara Combined Cycle Dual Fuel Power Plant strategically manages its fuel supply with a dual-fuel system, utilizing both Natural Gas and High-Speed Diesel (HSD). While the primary fuel source is natural gas, the project recognizes the importance of contingency planning for emergency situations or potential gas supply interruptions. To address this, the plant incorporates HSD as a backup fuel. Bangladesh Petroleum Corporation (BPC) oversees the importation of HSD from abroad and its transportation to the facility. BPC is actively involved in ensuring a seamless fuel supply chain, involving the preparation of tankers, the construction of HSD storage facilities in Khulna, and railway upgrades for efficient transportation to the Bheramara site. Two large HSD storage tanks, each with a capacity of 50,000 kL, are also constructed at the power plant. T (JICA, 2009). The plant uses natural gas as the primary fuel and High-Speed Diesel (HSD) as backup fuel during gas supply shortages. The natural gas supply is provided by Sundarban Gas Company Limited (IAR, 2025).
Capacity Charge
Gas: Under the Power Purchase Agreement (PPA), the Bheramara 410 MW (NWPGCL) DFG Power Plant will receive a huge capacity payment. Based on estimated calculations, the annual capacity charge is approximately BDT 1,503.08 crore at 90% PLF, BDT 1002.05 crore at 60% PLF, and BDT 668.04 crore at 40% PLF. Over the 22-year tenure , total capacity payments could range from approximately BDT 147.048 Billion to BDT 330.6676Billion, depending on the plant's load factor.
Environment
According to Section 12 of the Bangladesh Environment Protection Act 1995, Environmental Impact Assessment (EIA) is obligatory for any industry (MOLJPA, 1995). Polluting industries, such as power plants, must undergo an Initial Environmental Examination (IEE) and EIA as directed in the Environmental Conservation Rules 2017 (MOEFCC 1997). However, no EIA report was found for this power plant. The combustion of diesel fuel in HSD power plants contributes to climate change by releasing CO2 and other greenhouse gases into the atmosphere, exacerbating global warming and its associated impacts such as sea level rise, extreme weather events, and ecosystem disruptions. Moreover, HSD power plants often produce significant noise levels during operation, particularly from the machinery and cooling systems. This noise can disturb nearby residents, and sensitive ecosystems. According to the environmental conservation rule 2023 the project falls in the “Red” indicating it as a potential harmful project for the environment (MOEFCC 2023).
References
IAR 2025.INDUSTRIAL ATTACHMENT REPORT ON NORTH-WEST POWER GENERATION COMPANY LIMITED BHERAMARA 410 MW COMBINED CYCLE POWER PLANT KUSHTIA, BANGLADESH.Industrial Attachment Report: Bheramara 410 MW Combined Cycle Power Plant: January 2025.
FE 2018. “PM Hasina inaugurates Bheramara 410-MW Power Plant” The Financial Express (FE) : 26 November 2023.
GEMW 2023. “Background of Bheramara power station”. Global Energy Monitor Wiki (GEMW): 25 November 2023.
JICA 2009. “Site conditions''. The Study Of Bheramara Combined Cycle Power Station In Bangladesh, Final Report by Japan International Cooperation Agency (JICA): 25 November 2023.
MOEFCC (2023). “The Environmental Conservation Rules”. Ministry of Environment, Forest and Climate Change (MOEFCC): 5 March 2023.
MOEFCC 1997. The Environmental Conservation Rules. Ministry of Environment, Forest and Climate Change (MOEFCC): 27 August 1997.
MOLJPA (1995). Bangladesh Environment Conservation Act 1995. Legislative and Parliamentary Affairs Division, Ministry of Law, Justice and Parliamentary Affairs (MOLJPA): 16 February 1995.
NWPGCL 2023. “Bheramara 410 MW Combined Cycle Power Plant”. North-West Power Generation Company Limited (NWPGCL): 26 November 2023.