Dohazari 100 MW (BPDB) HFO Power Plant
- 5 days ago
- 3 min read
Current Status: Operation

Source: (YouTube)
Dohazari 100 MW Furnace Oil Power Plant, also known as Dohazari-Kaliaish Peaking Power Plant or Sangu Peaking Power Plant, is a reciprocating engine-based power plant situated in Dohazari under Chandanaish Upazila in Chattogram District of Bangladesh (Location: 22.1523, 92.0712). It is sponsored by Bangladesh Power Development Board (BPDB) as a State-owned Power Plant (SOPP) for 22 years. The power plant started its commercial operation on 31 December 2011 and, as per schedule, it will retire on 30 December 2036.
Capacity
The installed and net capacity of the Dohazari peaking power plant is 102 MW and 100 MW respectively.
Context
In 2011 , Dohazari 100 MW (BPDB) HFO Power Plant started its commercial operation located about 43 km from Chittagong. All the work in this region depends on this power plant. From agricultural work to factories, everything depends on this power plant. Apart from meeting the needs of the rural people, it is also taking other steps to avoid power shortages. From this power plant, electricity supply to South Chittagong is kept normal through the national grid. 450 tons of fuel oil is required to run the plant full time one day. These fuels are transported daily through railracks (in oil tankers) because of the construction of Kalurghat Bridge (DA, 2023). It doesn't supply the electricity according to the aggrement. After starting the commercial operations 89 MW is available from the 100 MW Dohajari power plant (DP ,2023),
The Dohazari plant was constructed by Chinese company Guangdong Power Engineering Company, with machinery supplied by Wärtsilä Engine of Finland. The plant is equipped with dual-fuel facilities, capable of running on both gas and furnace oil. (TDS, 2010) The plant consists of not more than 16 identical units of heavy-duty, medium-speed engine generators (500–750 rpm), diesel cycle engines fired on HFO, with provision to convert to natural gas in future, delivering a net output of 98.164 MW at site conditions of 35°C, 1.013 bar, and 98% relative humidity. (Sunrise Enterprise).
Land Acquisition
According to google earth the total land coverage area is 2.11 acres.
Finance
No information is found on the finance of the power plant.
Sponsor
Bangladesh Power Development Board has sponsored this power plant.
Contractor
No information is found on the contractor of the power plant.
Fuel Supply
This is an oil based power plant and Petrobangla supposedly taken the responsibility to manage the fuel .
Power Generation
The scheduled Commercial Operation Date (COD) of the power plant was 30 November 2011 (BPDB 2010).The plant has a rated net capacity of 98.164 MW at site conditions (SE, n.d.), though as of 2023 it operates at a derated output of 89 MW — approximately 11% below its rated net capacity (DP, 2023).
Environment
HFO contains high levels of sulfur and other pollutants, which are released into the atmosphere when burned. This can contribute to air pollution, leading to respiratory problems and other health issues in nearby communities. Environmental Impact Assessment (EIA) report is mandatory for this power plant and in accordance with Section 12 of the 1995 Bangladesh Environment Protection Act, it is obligatory for industries, including those causing pollution like power plants, to undergo both an Initial Environmental Examination (IEE) and an Environmental Impact Assessment (EIA) as outlined in the 1997 (superseded by ECR 2023) Environmental Conservation Rules (MOLJPA 1995; MOEFCC 1997). Till date no EIA report has been found on this power plant.
Criticism
There was a proposal to change the name of this power plant to Sangu but the people in this area did not support this decision and they couldn't change the name.No EIA has been found for this powerplant. According to the environmental conservation rule 2023 the project falls in the “Red” indicating it as a potential harmful project for the environment (MOEFCC 2023).
References
BPDB 2010. Annual Report 2009-2010. Bangladesh Power Development Board: 1 August 2010.
DP, 2023. ভয়াবহ লোডশেডিংয়ে বিপর্্যস্ত চট্টগ্রাম , অচল ৫ বিদ্যুতকেন্দ্র।The Daily Desh Protikkhon. 10 May ,2023.
DA 2023. দোহাজারী পাওয়ার প্ল্যান্টের তেল পরিবহন নিয়ে দুশ্চিন্তা পিডিবির. Dainik Azadi. 07 May 2023.
MOEFCC (1997). The Environmental Conservation Rules. Ministry of Environment, Forest and Climate Change (MOEFCC): 27 August 1997
MOLJPA (1995). Bangladesh Environment Conservation Act 1995. Legislative and Parliamentary Affairs Division, Ministry of Law, Justice and Parliamentary Affairs (MOLJPA): 16 February 1995.
MOEFCC (2023). “The Environmental Conservation Rules”. Ministry of Environment, Forest and Climate Change (MOEFCC): 5 March 2023.
TDS (2010). "2 new peaking power plants by Sept next". The Daily Star (TDS): 6 October 2010.
SE (n.d.). "100 MW HFO Power Plant, Dohazari, Chittagong". Sunrise Enterprise (SE): Accessed on 23 May 2026.
ETBD (2024). "Dohazari 100 MW (BPDB) HFO Power Plant". Energy Transition Bangladesh (ETBD): Accessed on 23 May 2026.