Madanganj 102 MW (Summit) Dual Fuel Power Plant (Unit 1)
- 1 day ago
- 5 min read
Current Status: Retired

Source: Summit
Madanganj 102 MW Dual Fuel Power Plant, also known as Summit Narayanganj Rental Power Plant (Unit-I), is a reciprocating engine-based power plant situated on MN Ghoshal Road at Tikkar Mor of Madanganj under Bandar Upazila in Narayanganj District of Bangladesh (Location Map: 23.5897, 90.5152). It is sponsored by Summit Narayanganj Power Limited (SNPL), a Special Purpose Vehicle (SPV) of Summit Group, as a Quick Rental Power Plant (QRPP) for five years. The sponsor declared its Commercial Operation Date on 1 April 2011 and, as per schedule, the power plant was to retire on 31 March 2016. But the date has been rescheduled to 9 March 2022 after 6 years of extension. According to the latest report, it was retired on 18 August 2024 following the expiry of its PPA and cessation of power dispatch (BPDB, 2025).
Capacity
The installed and net capacity of Summit Narayanganj Unit-I Power Plant is 103 MW and 102 MW respectively.
Context
Honourable Prime Minister of Bangladesh, Sheikh Hasina inaugurated the 102 MW dual fuel power plant of Summit Narayanganj Power Limited in Madanganj, Narayanganj on 20th March 2011, just 270 days after signing of the contract. It is the first comprehensive dual fuel power plant in Bangladesh. All machines and auxiliaries were purchased from Wärtsilä is a Finnish company which manufactures and services power sources and other equipment in the energy markets. All other entities that have worked to complete this power plant were Bangladeshi companies such as Summit Power Limited, UDECO a Bangladeshi leading engineering & construction company and Energypac Power Generation Ltd. The power plant has been operational since 2011 under Summit Narayanganj Power Limited (SNPL) (Summit Power International). The 10-year agreement that Summit Power signed with Bangladesh Power Development Board (BPDB) to sell power from its Narayanganj power plant unit 1 expired on 31 March. The company said in a press release published on the website of both exchanges that it had received the letter from BPDB. According to the letter, the 102 MW Narayanganj unit was completely shut down on April 1 (The Business Standard, 2021). In order to extend the project's lifetime, Summit Power then submitted an application to the Ministry of Power, Energy, and Mineral Resources. The Bangladesh Rural Electrification Board (BREB) recently approved the production of the power plant once more in light of that application. After receiving verbal consent, the business said that power plant output resumed on March 24,2022. On 13 April, 2022 through Dhaka Stock Exchange (DSE), the company said that they have officially received consent for power generation from Power Development Board (PDB) and the generation contract will be effective for the next two years from March 23, 2022 (Share Biz, 2022). The finance minister said that they had renewed the contracts for two years against the proposals of five years. He also informed that the contracts were renewed on the condition of “no electricity, no payment”. Replying to another question, he said no payment would be given as a capacity charge, a clause under which the government pays a certain amount of fees in case of not buying power from the private producers (New Age, 2022).
According to disclosures by Summit Power, the latest Power Purchase Agreement (PPA) expired on 22 March 2024. Although BPDB later allowed operation under a "No Electricity, No Pay" arrangement, no electricity has been dispatched from the plant since 19 August 2024, meaning 18 August 2024 was effectively the last operating day. BPDB subsequently issued a No Objection Certificate stating that there was no further scope for renewing the PPA, ending the plant's operational life in Bangladesh (DS, 2025) .
Fuel Supply
The fuel supplier of this power plant is Summit Oil & Shipping Company Limited (SOSCL), a subsidiary of Summit Group, for the power plant (SOSCL 2022).
Sponsor
The sponsor of Madanganj 102 MW Dual Fuel Power Plant is Summit Power Limited (SPL).
Finance
The BPDB extended the term of the 102 MW rental power plant at Madanganj in Narayanganj district for 2 more years. The government has to pay Summit Narayanganj Power Limited BDT 1,156.52 crore (Business Insider, 2022). According to another source as per the approval the Bangladesh Power Development Board (BPDB) will pay BDT 11.58 billion to Summit Narayanganj Power Limited's 102 MW Madanganj plant. Per unit power from this power plant cost BDT 16.40, which is BDT 1.12 less than the previous cost of BDT 17.52. (FE, 2022).
Power Generation
Total power generation from 2010-2011 to 2021-22 is 4516.97 gWh.
Capacity Charge
Bangladesh Power Development Board (BPDB) had to pay the sponsor BDT 1563.27 crore as a capacity charge till 2022-2023. The average per unit cost is 12.15 BDT. Total cost of the power plant till FY 2022-2023 is 5763.02 crore BDT.
Year | Generation (gWh) | Total Cost (crore BDT) | Unit Cost (avg BDT) | Capacity (crore BDT) |
FY 2022-2023 | 0.00 | 0.00 | 0.00 | 0.00 |
FY 2021-2022 | 109.32 | 210.02 | 19.21 | 33.12 |
FY 2020-2021 | 353.34 | 343.61 | 9.72 | 73.14 |
FY 2019-2020 | 223.22 | 265.85 | 11.91 | 145.25 |
FY 2018-2019 | 204.83 | 345.83 | 16.88 | 144.43 |
FY 2017-2018 | 310.14 | 374.67 | 12.08 | 144.03 |
FY 2016- 2017 | 463.06 | 408.24 | 8.82 | 132.45 |
FY 2015-2016 | 577.19 | 480.42 | 8.32 | 174.11 |
FY 2014-2015 | 579.82 | 720.57 | 12.43 | 168.83 |
FY 2013-2014 | 555.63 | 876.44 | 15.77 | 167.05 |
FY 2012-2013 | 526.07 | 882.37 | 16.77 | 169.53 |
FY 2011-2012 | 413.85 | 643.90 | 15.56 | 171.83 |
FY 2010-2011 | 200.50 | 211.10 | 10.53 | 39.50 |
Total | 4516.97 | 5763.02 | 12.15 | 1563.27 |
Environment
According to Section 12 of the Bangladesh Environment Protection Act 1995, Environmental Impact Assessment (EIA) is obligatory for any industry (MOLJPA 1995). Polluting industries, such as power plants, must undergo an Initial Environmental Examination (IEE) and EIA as directed in the Environmental Conservation Rules 2017 (MOEFCC 1997). But, to date, an IEE or EIA report has yet to be conducted for the power plant.
Criticism
The operation of rental power plants usually involves the consumption of significant amounts of fuel. The country depend on foreign import in case of HFO, transportation and extraction of the fuel can contribute to resource depletion and environmental degradation. The burning of fossil fuels in rental power plants releases greenhouse gases, contributing to climate change. This is a global issue with long-term consequences. Moreover, the rental and quick rental power plant also creating great economic burden for the country. The old and outdated rentals will create an additional burden of BDT 2,726 crore (USD 317 million) annually, with BDT 594 crore coming from capacity charges (Mehedi H., 2022). According to the environmental conservation rule 2023 the project falls in the “Red” indicating it as a potential harmful project for the environment (MOEFCC 2023).
References
BI (2022). “5 rental power plants get extension by 2 more years: Kamal”. Business Insider (BI): 23 March, 2022.
BPDB (2025). Annual Report 2024-2025. Bangladesh Power Development Board: 09 August, 2025.
DS (2025). Summit Power to sell 102MW Narayanganj plant to UAE firm. The Daily Star: 13 August 2025.
FE (2022). “Contracts of 10 rental power plants extended in four months”. The Financial Express (FE): 11 April, 2022.
Mehedi H. (2022). “BPDB Trapped by Expensive Rental Power Plants: Rental and Quick Power Plants must be phased out as soon as possible”. Bangladesh Working Group on External Debt (BWGED): March, 2022.
MOEFCC (1997). ‘The Environmental Conservation Rules’. Ministry of Environment, Forest and Climate Change (MOEFCC): 27 August 1997.
MOEFCC (2023). “The Environmental Conservation Rules”. Ministry of Environment, Forest and Climate Change (MOEFCC): 5 March 2023.
MOLJPA (1995). ‘Bangladesh Environment Conservation Act 1995’. Legislative and Parliamentary Affairs Division, Ministry of Law, Justice and Parliamentary Affairs (MOLJPA): 16 February, 1995
New Age (2022).”Govt renews five rental power plants”. New Age: 23 March, 2022.
Share Biz (2022). “মদনগঞ্জ বিদ্যুৎকেন্দ্রের মেয়াদ বাড়ানোর চিঠি পেয়েছে সামিট পাওয়ার”. Share Biz: 14 April, 2022.
SOSCL (2022).”Our Business: Fuel Supply”. Summit Oil & Shipping Co. Ltd (SOSCL): 2022.
SPL (2010). “Annual Report 2010”. Summit Power Limited (SPL): 2010.
TBS (2021). “Summit’s 102MW Narayanganj plant contract expires”. The Business Standard (TBS) 9: 05 April, 2021.