EIA DOCUMENTS
According to the Environmental Conservation Act 1995, including amendments and Environmental Conservation Rules of Bangladesh, the infrastructures are divided into four categories: (a) Green, which has almost zero impact, such as printing press; (b) Yellow, which has a minimum impact, such as solar power plant (bellow 50 MW), (c) Orange, which has a moderate impact, such as solar power plant (over 50 MW), and (d) Red, which has a severe impact on the environment, such as coal, oil and gas power plants. Yellow and Orange category projects must submit an Initial Environmental Examination (IEE) for environmental clearance. In contrast, the infrastructure under the Red Category must submit an IEE for site clearance and an Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) to get environmental clearance. Besides, red-category projects require the renewal of the environmental clearance annually.
The Department of Environment (DOE) is responsible for receiving, analyzing and approving the EIA documents. The DOE, sponsoring companies, and financiers are accountable for disclosing it. In 2021, DOE declined to disclose the EIA report of Barisal Electric Power Company Limited (BEPCL), claiming it even as an Intellectual Property, although it is a public document. However, only Infrastructure Development Company Limited (IDCOL) published some of its financed projects' EIA, but some links are invalid. Other scheduled banks never published any EIA under their disclosure policies. The sponsor companies only publish EIA when the financiers force them to do so.
The EIA disclosed here are not the property of the Bangladesh Working Group on Ecology and Development (BWGED), Coastal Livelihood and Environmental Action Network (CLEAN) or any other collecting organizations; instead, they were collected from ADB, AIIB, IFC, DOE, IDCOL, MIGA, World Bank, the operating company and other institutions. As the EIAs are public documents, feel free to download and use them in any form, even without any citation.
​
Expected Citation: ETB (YYYY). Name of the Document. Retrieved from Energy Transition Bangladesh (ETB): Accessed DD Mmm YYYY.
EIA/ESIA of the Power and Energy Infrastructures
A B C D E F G H I J K L M
N O P Q R S T U V W X Y Z
Banshkhali 1224 MW (SS Power) Coal Power Plant: EIA Approval (2017 Apr)
Banshkhali 1224 MW (SS Power) Coal Power Plant: EIA (2015 Aug)
Banshkhali 1224 MW (SS Power) Coal Power Plant: ESMP Study (2020 Oct-Dec)
Banshkhali 1224 MW (SS Power) Coal Power Plant: Land Approval (2015 Nov)
Barishal 350 MW (BEPCL) Coal Power Plant: EIA (2018 Nov)
Bhola 218 MW (Lanco) Gas Power Plant: EIA (2012-08)
Bhola 220 MW (NBBL) Dual Fuel Power Plant: Cumulative (2019 Sep)
Bhola 220 MW (NBBL) Dual Fuel Power Plant: EIA Approval (2017 Apr)
Bhola 220 MW (NBBL) Dual Fuel Power Plant: EIA (2018 Jan)
Bhola 220 MW (NBBL) Dual Fuel Power Plant: EIA Addendum (2020 Jan)
Bhola 220 MW (NBBL) Dual Fuel Power Plant: EIA Annex (2017 March)
Bhola 220 MW (NBBL) Dual Fuel Power Plant: Project Summary (2018 Jan)
Bibiyana 1&2 (Summit) Gas Power Plant: EIA Draft (2011 Jun)
Bibiyana 341 MW (Summit) Gas Power Plant (Unit-2): EIA (2014 Jul)
Gazaria 350 MW (RPCL) Coal Power Plant: Feasibility Study (2017 Feb)
Gazaria 635 MW (Orion) Coal Power Plant: EIA (2016 Oct)
Gazaria 635 MW (Orion) Coal Power Plant: EIA Vol-1 (2018 Jan)
Gazaria 635 MW (Orion) Coal Power Plant: EIA Vol-2.1 (2018 Jan)
Gazaria 635 MW (Orion) Coal Power Plant: EIA Vol-2.2 (2018 Jan)
Gazaria 635 MW (Orion) Coal Power Plant: EIA Vol-3 (2018 Jan)
Gazaria 635 MW (Orion) Coal Power Plant: EIA Vol-4 (2018 Jan)
Godda 1600 MW (Adani) Coal Power Plant: EIA Vol-1 (2017 Apr)
Godda 1600 MW (Adani) Coal Power Plant: EIA Vol-2 (2017 Apr)
Godda 1600 MW (Adani) Coal Power Plant: Pre-feasibility Study (2016 May)
Khulna 150 MW (NWPGCL) Dual Fuel Power Plant: EIA (2010 Mar)
Khulna 225 MW (NWPGCL) Dual Fuel Power Plant: EIA (2013 Aug)
Lalmonirhat 30 MW (Intraco) Solar Power Plant: ESIA (2023 Jan)
Lalmonirhat 30 MW (Intraco) Solar Power Plant: SLA (2023 May)
Madarganj 100 MW (BRPL) Solar Power Plant: IEE (2022 Aug)
Majhipara 8 MW (Sympa) Solar Power Plant: ESIA (2020 Oct)
Manikganj 35 MW (Spectra) Solar Power Plant: IEE Vol-2 (2019 Apr)
Manikganj 35 MW (Spectra) Solar Power Plant: IEE Vol-3 (2019 Apr)
Manikganj 35 MW (Spectra) Solar Power Plant: IEE Annex (2019 Apr)
Matarbari 635 MW (Orion) Coal Power Plant: EIA Vol-1 (2023 Apr)
Matarbari 635 MW (Orion) Coal Power Plant: EIA Vol-1 (2023 Sep)
Matarbari 635 MW (Orion) Coal Power Plant: EIA Vol-2 (2023 Apr)
Matarbari 635 MW (Orion) Coal Power Plant: EIA Vol-2 (2023 Sep)
Matarbari 1200 MW (CPGCBL) Coal Power Plant (Phase-1): EIA Vol-1 (2013 Jun)
Matarbari 1200 MW (CPGCBL) Coal Power Plant (Phase-2): Survey (2022 Jan)
Matarbari-Chakaria Transmission Line and Substation: EIA (2013 Jun)
Matarbari-Mohiraghona-Dhalghata Road Construction: EIA (2015 Oct)
Meghnaghat 583 MW (Summit) LNG Power Plant: ESIA (2017 Nov)
Meghnaghat 583 MW (Summit) LNG Power Plant: ESIA (2018 Feb)
Meghnaghat 584 MW (Unique) LNG Power Plant: ESIA (2022 Mar)
Meghnaghat 718 MW (JERA) LNG Power Plant: ESIA (2017 Oct)
Moheshkhali 500 Mmcfd (Excelerate) LNG Terminal: ESIA (2017 April)
Mongla 100 MW (Energon) Solar Power Plant: ESIA (2020 Mar)
Monpura 3 MW (WMSPL) Hybrid Power Plant: ESIA (2024 April)
Mymensingh 360 MW (RPCL) Gas Power Plant: EIA (2017 Dec)
Narayanganj 102 MW (Summit) HFO Power Plant: EIA (2010 Nov)
Nawabganj 55 MW (Doreen) HFO Power Plant: SIA Document (2013 Apr)
North Dhaka 42.5 MW (CMEC) WTE Power Plant: ES Due Diligence (2025 Jan)
North Dhaka 42.5 MW (CMEC) WTE Power Plant: ESIA (2023 Mar)
North Dhaka 42.5 MW (CMEC) WTE Power Plant: ESIA Vol-1 (2023 May)
North Dhaka 42.5 MW (CMEC) WTE Power Plant: ESIA Vol-2 (2023 May)
North Dhaka 42.5 MW (CMEC) WTE Power Plant: ESIA Draft (2024 Jul)
North Dhaka 42.5 MW (CMEC) WTE Power Plant: ESIA (2024 Aug)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-1 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-2 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-3 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-4 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-5 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-6 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-7 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-8 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-9 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-10 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-11 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-12 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-13 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-14 (2023 Oct)
Pabna 100 MW (Dynamic Sun) Solar Power Plant: ESIA Vol-15 (2023 Oct)
Patenga 50 MW (Baraka) HFO Power Plant: EIA (2013 Oct)
Patuakhali 1320 MW (RNPL) Coal Power Plant: EIA Vol-1 (2017 Jun)
Payra 1320 MW (BCPCL) Coal Power Plant (Ph-1): EIA (2015 Sep)
Payra 1320 MW (BCPCL) Coal Power Plant (Ph-2): EIA Approval (2019 Oct)
Rampal 1320 MW (BIFPCL) Coal Power Plant: EIA (2013 Jul)
Rupsha 800 MW (NWPGCL) LNG Power Plant: EIA Vol-1 (2019 Oct)
Rupsha 800 MW (NWPGCL) LNG Power Plant: EIA Vol-2 (2019 Oct)
Rupsha 800 MW (NWPGCL) LNG Power Plant: EIA Vol-3 (2019 Oct)
Rupsha 800 MW (NWPGCL) LNG Power Plant: EIA Annex (2019 Oct)
Rupsha 800 MW (NWPGCL) LNG Power Plant: Resettlement Plan (2018 Mar)
Saidpur 150 MW (BPDB) HSD Power Plant: EIA (2019 Dec)
Sirajganj 68 MW (BCRECL) Solar Power Plant: ESIA (2024 Jul)
Sirajganj 68 MW (BCRECL) Solar Power Plant: Resettlement Vol-1 (2024 Jul)
Sirajganj 68 MW (BCRECL) Solar Power Plant: Resettlement Vol-2 (2024 Jul)
Sirajganj 150 MW (NWPGCL) Dual Fuel Power Plant (Unit-1): EIA (2010 Mar)
Sirajganj 225 MW (NWPGCL) Dual Fuel Power Plant (Unit-1): EIA (2013 Nov)
Sirajganj 225 MW (NWPGCL) Dual Fuel Power Plant (Unit-2): EIA (2015 Nov)
Sirajganj 225 MW (NWPGCL) Dual Fuel Power Plant (Unit-3): EIA (2015 Nov)
Sirajganj 410 MW (SNWPCL) Dual Fuel Power Plant (Unit-4): ESIA (2016 Aug)
Summit Corporation Limited: ES Due Diligence (2016 May)
Summit Corporation Limited: ESDD CC Power Plants (2016 May)
Summit Corporation Limited: ESDD Future Power Plants (2016 May)
Summit Corporation Limited: ESDD Gas Power Plants (2016 May)
Summit Corporation Limited: ESDD HFO Power Plants (2016 May)
Summit Corporation Limited: ESDD KPCL Power Plants (2016 May)
Sunkoshi-3 683 MW (DOED) Hydropower Plant: EIA (2022 Feb)